• Preview of Takt Time and Line Balancing CalculatorExcel workbook preview

Lean and Continuous Improvement

Takt Time and Line Balancing Calculator

$17.99 Free XLSX
Excel workbook · 13 KB

3 downloads per free account, no card needed.

Need more than 3? Get all 300 templates for $249 One payment, lifetime access, including every template added later.

Who this is for

A production engineer asked how many operators a line needs for a new demand level, and where the bottleneck is.

What is inside

  • Takt and planned cycle time from shifts, breaks, stops and demand
  • 10 sample stations of a pump assembly line with operators per station
  • Each station flagged over takt, over planned cycle, or OK
  • Operators needed, balance efficiency and balance loss, live formulas
  • Bottleneck station and maximum daily output against demand
  • Yamazumi chart of time per operator with takt and planned cycle lines

How to use it: Fill the yellow shift and demand cells, enter work content per station from time studies, and move work off the red stations.

Files & formats
  • XLSXtakt-time-and-line-balancing-calculator.xlsx13 KB

Opens in Microsoft Word or Excel, Google Docs or Sheets and LibreOffice. Delivered instantly from your browser.

Free downloads & full access

Every account gets 3 free downloads. Re-downloading a template you already have does not count. This template on its own is $17.99, and buying it keeps your free downloads for something else. Full access is a one-time $249 for all 300 templates, for life.

Bought with a different email? Open your account and enter your order number.

Licence

Use and adapt the document inside your own organisation or for your own clients. Do not resell or republish the templates themselves.