-
Word document preview
Six Sigma and Statistical Quality
Control Phase Handover Plan Template
3 downloads per free account, no card needed.
Who this is for
A Green Belt closing a project whose process owner must accept the improved process, and whose sponsor wants proof the gain will hold after the team leaves.
What is inside
- Worked example: extrusion line scrap cut from 4.1% to 1.2% handed to the production manager
- Results table: baseline, target, achieved and the data period for each metric
- Control plan table with specification, method and frequency, control and owner
- Reaction plan table: trigger, immediate action, who and escalation
- Monitoring and audit schedule over 6 months after handover
- Acceptance criteria and a sign-off table for project lead, process owner and sponsor
How to use it: Agree the control plan and the reaction plan with the process owner before the Control tollgate; the owner signs only when the controls are running, not planned.
Files & formats
- DOCXcontrol-phase-handover-plan-template.docx40 KB
Opens in Microsoft Word or Excel, Google Docs or Sheets and LibreOffice. Delivered instantly from your browser.
Free downloads & full access
Every account gets 3 free downloads. Re-downloading a template you already have does not count. This template on its own is $12.99, and buying it keeps your free downloads for something else. Full access is a one-time $249 for all 300 templates, for life.
Bought with a different email? Open your account and enter your order number.
Licence
Use and adapt the document inside your own organisation or for your own clients. Do not resell or republish the templates themselves.


